Methodological Foundations for Pricing of Construction Projects
DOI:
https://doi.org/10.26906/EiR.2021.3(82).2372Keywords:
procurements, design-build, , traditional contracts, , international practices, completed projectsAbstract
Searching for the optimal mechanism for the implementation of the construction project, which would provide both – the flexibility of the process and the maximum interaction of all stakeholders (investor/customer, designer, contractor), compliance with the budget and construction deadlines resulted to elaboration of a large number of alternative schemes for contract implementation and this article dedicated Design-Build scheme. DB contracts promote an integrated approach to construction and solve some problems faced by the construction industry today, for example, when the contractor is not responsible for design documentation developed by the design organization and often finds defects in design documentation that require additional time and considerable resources for correction.
References
Design-Build Institute of America (DBIA). Retrieved from: https://dbia.org/what-is-design-build/
Naoum S. G., Langford D. A. (1990). An Investigation into the Performance of Management Contracts and the Traditional Method of Building Procurement, in CIB 90 Proceedings of International Symposium on Building Economics and Construction Management: Managing Projects. Ed. by V. Ireland, P. Lansley, A. Ralcha, S. Singh. Australia: Sydney, 351–360.
Хіа Во, Chan Albert, & Yeung, John F.Y. (2009). Identification of key competences of design-builders in the construction market of the People’s Re-public of China (PRC).Construction Management and Economics, 27(11), pp. 1141–1152.
Design-Build Data Sourcebook, DBIA, 2021.
An Analysis of Design/Build vs. Design-Bid-Build. Retrieved from: https://dbia.org/what-is-design-build/
DSTU B D.1.1-7:2013 Pravyla vyznachennia vartosti proektno-vyshukuvalnykh robit ta ekspertyzy proektnoi dokumentatsii na budivnytstvo. Retrieved from: http://www.smeta.kharkov.ua/
Zbirnyk tsin na proektni roboty dlia budivnytstva. Rozdil 38 Zaliznytsi ta avtomobilni dorohy. Mosty. Tuneli. Metropoliteny. Promyslovyi transport. Retrieved from: http://www.smeta.kharkov.ua/
Sabihah Saaidin, Intan Endut. (2006). The Current Practice of Design and Build Procurement Process in Malaysia.