IDENTIFICATION AND MANAGEMENT OF RISKS IN THE PROJECT MANAGEMENT OF THE DEVELOPMENT OF SOFTWARE PRODUCTS

Authors

  • О. Skakalina
  • A. Kapiton

DOI:

https://doi.org/10.26906/SUNZ.2023.1.145

Keywords:

risks, project management, optimization, identification, Risky Project

Abstract

Software development is one of the most difficult areas of intellectual activity for forecasting and planning. By their nature, digital products are intangible, and software development projects often involve many stakeholders. Software development processes typically include several stages, including design, documentation, programming, and testing, all of which require a high level of professional, technological, and managerial knowledge. Due to the complex nature of digital projects, from the very beginning of the implementation of any software project, it is necessary to take into account and manage a wide range of risks, which are one of the most important factors affecting the success of a digital project. The work analyzes and classifies project risks, conducts a qualitative and quantitative identification of the main risks for the selected subject area, the Crawford card method was used to work with project risks, the risks were ranked, a responsibility matrix for the project was created, the workload of the project resources was analyzed, and the project was optimized.

Downloads

References

A Guide to the Project Management Body of Knowledge (PMBOK Guide) Seventh Edition and The Standard for Project Management. 2021

Skakalina E. V. (2021). IMPLEMENTATION OF RISC PROJECT MANAGEMENT METHODOLOGY WHEN DEVELOPING A MOBILE APPLICATION FOR HEALTH CONTROL OF PATIENTS WITH DIABETES MELLITUS. Intellectual capital is the foundation of innovative development: engineering, computer science, safety, transport, physics and mathematics, biology and ecology, agriculture. Monographic series «European Science». Book 6. Part 4. 2021. Chapter 3. Karlsruhe, Germany.

Скакаліна О.В. Управління ризиками засобами ERP – систем // VI Міжнародна науково- практична конференція «Інформаційні технології та взаємодії» IT&T – 2019 (20 грудня 2019 року) / Матеріали доповідей . – Київ : МОН України, 2019.- С.84-87.

Проектні ризики і невизначеність –https://4brain.ru/project/vipolnenie.php

Erik Bethke. Game Development and Production. Texas: Wordware Publishing, Inc, 2013. 437 с.

Integrated Risk Management (IRM). gartner.com: веб-сайт. URL: https://www.gartner.com/en/informationtechnology/glossary/integrated-risk-management-irm (дата звернення: 16.10.2022).

Sytnyk, V.A., Bulashov, V.V. Methodology for managing the development of it projects with open source/ 5th International conference on Eurasian scientific development in 2018: new methods and solutions». Proceedings of the Conference (September 02, 2018). Premier Publishing s.r.o. Vienna. 2018.46 p. ISBN-13 978-3-903197-73-2

Barska, I. Algorithm of Distributing the Team Load for IT-Project / Barska I., Teslenko P., Fesenko T., Voznyi O. // Proceedings of the 2015 IEEE 8th International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications (IDAACS). — Warsaw: University of Technology, 2015. — p. 559 – 562.

Downloads

Published

2023-03-17

Most read articles by the same author(s)

1 2 > >>