PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION
DOI:
https://doi.org/10.26906/znp.2017.49.832Keywords:
monitoring, subway station, transitional tunnel, reconstruction, design model, ground, deformation, stressesAbstract
Modern technologies for the construction of a subway underground allow reconstruction of operated stations without stopping the movement of trains and subway disruptions. However, this problem is quite complicated, because at the device of transitive tunnels it is possible to violate the stress-strain state of the main load-bearing structures and ground of the station base, track upper-structure drawdown appearance that is impermissible for the safe operation of the subway. The article presents the results of the preparatory stage of theMinsk subway station main load-carrying structures state monitoring, as well as the results of spatial calculations based on design data, considering the stage of transition tunnel construction work from the first to the third branches.
References
Eurocode. Fundamentals of structural design. TCH EN 1990-2011 (02250) [Introduced from
-07-07]. – Minsk: MAiS, 2012. – 70 p.
Eurocode 1. Effects on the structure. Impacts in the manufacture of construction works.
TCH EN 1991-1-6-2009 (02250) [Introduced from 2010-01-01]. – Minsk: MAiS, 2009. – 32 p.
Eurocode 1. Impact on the structure. Part 1-7. General effects. Special effects.
TCH EN 1991-1-7-2009 (02250) [Introduced from 2010-01-01]. – Minsk: MAiS, 2010. – 64 p.
SNB 5.03.01-02. Concrete and reinforced concrete structures [Introduced from 2003-07-01]. – Ministry of Architecture. – Minsk: Stroytechnorm, 2003. – 139 p.
/ Eurocode 2. Design of reinforced concrete structures. Part 1-1. General rules and rules for buildings. TCH EN 1992-1-1-2009* (02250) (EN 1992-1-1: 2004 + AC: 2010, IDT). [Introduced from 2010-01-01]. – Minsk: Ministry of Construction Architecture of the Republic of Belarus, Stroytechnorm, StrojMediaProject, 2015. – XIV, 205 p.
Kurata N. Risk Monitoring of Buildings Using Wireless Sensor Network / N. Kurata, B.F. Spencer, Jr.M. Ruiz-Sandoval. – 2005. – 6 p.
Bulychev N. N. The Mechanics of Underground Structures in Examples and Problems / N. N. Bulychev. – M.: Nedra, 1989. – 270 p.
Frolov J. The Mechanics of Underground Structures: Proc. allowance / J. Frolov, Т. Ivanes; Petersburg. State University road communication. – St. Petersburg: PGUPS, 1997. – 102 p.
Perelmuter A. Calculation models of structures and the possibility of their analysis / A. Perelmuter, V. I. Sour cream. – M.: SCAD SOFT, 2011 – 736 p.
Pastushkov G. P. On the transition to European standards for the design of bridge structures in the Republic of Belarus / G. P. Pastushkov, V. G. Pastushkov // Transport. Transport facilities. Ecology. – Minsk, 2011. – No. 2. – P. 113 – 121.
Pastushkov G.P. Durability of reinforced concrete bridges – the major problem of road branch: Proceedings of the International Conference «Construction and Architecture» / G. P. Pastushkov, V. G. Pastushkov. Edited by B. M. Khroustaliev and S. N. Leonovich. – Minsk, 2003. –
P. 322 – 332.
Pastushkov G.P. Basic requirements for the design of bridge structures in accordance with European standards / G. P. Pastushkov, V. G. Pastushkov // Modernization and scientific research in the transport complex. – Minsk, 2013. – T. 3. – P. 368 – 375.
Pastushkov V. G. Scientific support for the design and construction of a three-level interchange in Minsk / V. G. Pastushkov, I. L. Boyko, G. P. Pastushkov // Automobile roads and bridges. – Minsk, 2015. – No. 2. – P. 11 – 17.
Skolnik D. Tentative Title: Instrumentation for Structural Health Monitoring / D. Skolnik. – Los Angeles, CA, 2008.
Mechanized Tunneling in Urban Areas: Design Methodology and Construction Control / Edited by V. Guglielmetti, P. Grasso, A. Mahtab, Sh. Xu // Geodata S.p.A. – Turin, Italy, 2007. – 528 p.