Pastushkov, G. P., and M. A. Kisel. “PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION”. Academic Journal. Industrial Machine, Building Civil Engineering, vol. 2, no. 49, Oct. 2017, pp. 116-25, https://doi.org/10.26906/znp.2017.49.832.