[1]
I. Emeljanova, D. Chayka, V. Bondar, and V. Virchenko, “Concrete pump working capacity determination in the composition of small-sized technological set equipment for the wet method gunite work”, ZNP, vol. 2, no. 51, pp. 166–170, Oct. 2018, doi: 10.26906/znp.2018.51.1310.