[1]
G. P. Pastushkov and M. A. Kisel, “PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION”, ZNP, vol. 2, no. 49, pp. 116–125, Oct. 2017, doi: 10.26906/znp.2017.49.832.