Emeljanova, I. (2018) “Concrete pump working capacity determination in the composition of small-sized technological set equipment for the wet method gunite work”, Academic journal. Industrial Machine, Building Civil Engineering, 2(51), pp. 166–170. doi:10.26906/znp.2018.51.1310.