Emeljanova, I., Chayka, D., Bondar, V., & Virchenko, V. (2018). Concrete pump working capacity determination in the composition of small-sized technological set equipment for the wet method gunite work. Academic Journal. Industrial Machine, Building Civil Engineering, 2(51), 166-170. https://doi.org/10.26906/znp.2018.51.1310