1.
Emeljanova I, Chayka D, Bondar V, Virchenko V. Concrete pump working capacity determination in the composition of small-sized technological set equipment for the wet method gunite work. ZNP. 2018;2(51):166-170. doi:10.26906/znp.2018.51.1310