(1)
Emeljanova, I.; Chayka, D.; Bondar, V.; Virchenko, V. Concrete Pump Working Capacity Determination in the Composition of Small-Sized Technological Set Equipment for the Wet Method Gunite Work. ZNP 2018, 2 (51), 166-170. https://doi.org/10.26906/znp.2018.51.1310.