(1)
Pastushkov, G. P.; Kisel, M. A. PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION. ZNP 2017, 2 (49), 116-125. https://doi.org/10.26906/znp.2017.49.832.