Emeljanova, I. (2018) “Concrete pump working capacity determination in the composition of small-sized technological set equipment for the wet method gunite work”, Збірник наукових праць Галузеве машинобудування будівництво/ Academic journal Industrial Machine Building Civil Engineering, 2(51), pp. 166–170. doi: 10.26906/znp.2018.51.1310.