Pastushkov, G. P., and M. A. Kisel. 2017. “PREPARATORY STAGE FOR MONITORING THE LOAD-BEARING STRUCTURES OF THE OPERATED SUBWAY STATION”. Academic Journal Industrial Machine Building Civil Engineering 2 (49):116-25. https://doi.org/10.26906/znp.2017.49.832.